My New Job

Ok I will try to explain my new job.

First I get a crane.


Then I take a coil of steel.


And I place it on the coil car.



Then I move the coil car so the coil fits on the decoiler.



The steel rolls off the decoiler and into the straightener.



Then it goes thru two punch presses that put holes in certain locations.



Then it goes thru the shear that cuts it to size.



Then the cut piece goes down a conveyor belt.




Where it enters an oven to heat it up. I couldn't find an adequate picture, sorry. The heat is necessary for the paint to dry properly. (this comes later)

After the oven, the piece enters the rollformer.





The rollformer shapes it into a Cee or a Zee.






Then another conveyor takes it to the paint department, which is somebody else's job.



Here is the computer terminal which operates everything from the decoiler to the last conveyor belt.



Ok this has been the most basic of descriptions. The fact is, it's alot to keep track of. Everything is running at once. There is so much that can go wrong. I have to constantly be looking at and listening to the entire line to make sure everything is operating normally. And at the same time I have to be entering work order data into the computer. It's a little overwhelming at times. Especially when my trainer is rushing me. I understand why he does it, we have quotas they expect us to fill, about 10,000 feet of steel a day. I have to go now but I will write more in the comments later.

6 Comments:

At 12/30/2006 11:45:00 AM, Blogger PeggySueO said...

So you are supposed to do 10,000 feet of steel each day yourself? How many are you up to now?

 
At 12/30/2006 01:02:00 PM, Blogger Ruth said...

I was reading and reading and figured somebody else had taken over for their part long before you said they did. That's a LOT of responsibility alright. But I think they found a good man for the job. You'll get it eventually. Then you'll wonder why you ever thought it was difficult!

 
At 12/31/2006 02:44:00 PM, Blogger WDavid said...

Well, that's more detailed work than I could handle. BTW...the ZEE shuld be an ESS judging by the shape.

 
At 12/31/2006 03:14:00 PM, Blogger Fred MacKenzie said...

Peggy: I am not yet working by myself. But I think the most we have done in one day so far is 8,000. The problem is the rollformer is brand new, it started the first day I did. So everybody is trying to learn how to operate it at the same time. It is not being consistent in producing quality product. There are a thousand different ways to adjust it to try to get the part right, so trying to figure out what to change is sometimes a challenge. Friday we had a total of 3.5 hours downtime out of an 8 hour day. We only did 3500 feet.

Mom: Thanks for the vote of confidence.

Dad: The Cees and Zees are used in constructing steel buildings.

David: Yes, the picture looks like an Ess but if you look at the other end it would look like a Zee.

 
At 1/04/2007 04:00:00 PM, Blogger Fred MacKenzie said...

We actually did 11,449 feet today. There were several things working in our favor though.

1)We did Zees all day. This means there were no time consuming changeovers to Cees.
2)All our Zees were the same width, 8.5 inches. This means no time consuming changes to 6.5 or 11.5 inch widths.
3)Are of our Zees were either 14 or 15 gauge metal. This means no time consuming re-gauging of the rollformer, since the difference between 14 and 15 gauge is so miniscule.
4)Many of our Zees were very long. This means the paint dept doesn't get backed up with a lot of pieces. Compare 11,000 feet of 35 ft Zees to 11,000 feet of 10 ft Zees. That's about 300 pieces vs 1,100 pieces.
5)We only had one coil we didn't completely use, other than the last one. This means only one time consuming delay removing an unfinished coil.
6)There are two of us working. This means that things one worker would normally have to shut down the line to do, could be done while the line was still running. (quality checks of the pieces, getting a new coil, going to the bathroom, etc.)

So you see, I don't expect this kind of success every day. And I am concerned that management now thinks one person can do 11,000 feet a day, every day. I kind of doubt that I can.

 
At 1/04/2007 04:06:00 PM, Blogger WDavid said...

Well, next month when they ask you why you didn't do 11,000 all by yourself, just hand them that list of reasons and say "hire me a helper!"

 